Ability to manually add materials to the Material takeoff.
Ability to save and read the project results in the web Project.
Stability fixes in the Evaluation process.
Version 0.1.0 (September 2025)
What's new:
Project Settings includes DGNB properties needed for Lifecycle Assessment: usage profile / project category; reference study period / building lifetime; gross floor area (GFA); net floor area (NFA).
New DGNB LCA KPIs:
Total Material Mass
Total Material Mass per GFA
Total Material Mass per NFA
Detailed Material Takeoff in the Material Passport section
Evaluate page includes warnings for missing data that affects the LCA
Small improvements
"Load data" time show a more accurate loading time