Changelog

Version 0.1.0 (September 2025)

What's new:

  • Project Settings includes DGNB properties needed for Lifecycle Assessment: usage profile / project category; reference study period / building lifetime; gross floor area (GFA); net floor area (NFA).

  • New DGNB LCA KPIs:

    • Total Material Mass

    • Total Material Mass per GFA

    • Total Material Mass per NFA

  • Detailed Material Takeoff in the Material Passport section

  • Evaluate page includes warnings for missing data that affects the LCA

  • Small improvements

    • "Load data" time show a more accurate loading time

    • Help section includes a link to the documentation

Last updated